AttributeValue
River Station Date Observed River Level (m) Moderate Risk Levels (m) High Risk Levels (m) Bankfull (m)
Shabelle River Belet Weyne 19-10-2017 4.95 6.50 7.30 8.30
Shabelle River Bulo Burti 19-10-2017 4.78 6.50 7.20 8.00
Shabelle River Jowhar 19-10-2017 4.80 5.00 5.25 5.50
Jubba River Dollow 26-04-2017 1.40 6.00 6.00 6.00
Jubba River Luuq 16-10-2017 4.04 5.50 6.00 7.00
Jubba River Bardheere 19-10-2017 7.02 7.40 8.20 10.40
Jubba River Bualle 19-10-2017 4.73 9.00 10.00 12.00