AttributeValue
River Station Date Observed River Level (m) Moderate Risk Levels (m) High Risk Levels (m) Bankfull (m)
Shabelle River Belet Weyne 25-05-2017 4.78 6.50 7.30 8.30
Shabelle River Bulo Burti 25-05-2017 4.01 6.50 7.20 8.00
Shabelle River Jowhar 25-05-2017 5.00 5.00 5.25 5.50
Jubba River Dollow 26-04-2017 1.40 6.00 6.00 6.00
Jubba River Luuq 25-05-2017 3.14 5.50 6.00 7.00
Jubba River Bardheere 25-05-2017 4.74 7.40 8.20 10.40
Jubba River Bualle 25-05-2017 2.70 9.00 10.00 12.00