AttributeValue
River Station Date Observed River Level (m) Moderate Risk Levels (m) High Risk Levels (m) Bankfull (m)
Shabelle River Belet Weyne 25-02-2017 1.38 6.50 7.30 8.30
Shabelle River Bulo Burti 25-02-2017 1.28 6.50 7.20 8.00
Shabelle River Jowhar 25-02-2017 0.50 5.00 5.25 5.50
Jubba River Dollow 20-02-2017 1.00 6.00 6.00 6.00
Jubba River Luuq 25-02-2017 0.92 5.50 6.00 7.00
Jubba River Bardheere 24-02-2017 3.42 7.40 8.20 10.40
Jubba River Bualle 22-02-2017 1.40 9.00 10.00 12.00